Enniskillen Hospital Site

Backroom support for 3 year hospital construction project

Hacketts were appointed by FCC Elliott Construction to provide an onsite print facility for the 36 month duration of construction of the Enniskillen Acute Hospital, a project that was valued at €500m. During this period, Hacketts set up and staffed a purpose-built and fully equipped printroom on-site to service the print requirements of all contractors.

This facility gave our clients access to the latest technology without the need for costly investment on their part. They also had the backup support of our nationwide branch network, thereby eliminating any disruption during peak periods or machine downtime. Deadlines were always met due to both the commitment and dedication of Hacketts personnel, and our investment in the most up to date equipment available.

Hacketts were available to turn around large volumes at peak times and where necessary, extra staff and equipment were drafted in to ensure that deadlines met. This on-site facility enabled our clients to focus on the design and built aspect of the project, while Hacketts managed all aspects of print production and distribution.

Email a query